Pages

Showing posts with label sub floor. Show all posts
Showing posts with label sub floor. Show all posts

Monday, October 3, 2011

Birth of a Moomba Legend: Mojo Build Day 5

Moomba Boats @MoombaBoats is digitally chronicling the first production build of the new Mojo 2.5 wakeboard boat with daily build photo posts. This series of blog posts and photo gallery will illustrate the superior production processes that make a Moomba boat.

Yesterday was the fifth production day of this new Moomba wide-bow wake boat. Up to this point we have seen the structure of the boat created. The exterior of the boat is now given another close inspection in Parts Inspection or PI. The Mojo then moves to Rigging where underwater gear, ballast pick-ups and the Multi-sport Wakeplate are installed. Here we will also see the Mojo 2.5 being prepared for the Indmar engine, wiring routed and the dash installed.

If you missed the previous Mojo 2.5 build posts check'em out: Day 1, Day 2, Day 3 and Day 4

Birth of a Moomba Legend: Mojo Build Day 4

Moomba Boats @MoombaBoats is digitally chronicling the first production build of the new Mojo 2.5 wakeboard boat with daily build photo posts. This series of blog posts and photos galleries will illustrate the superior production processes that make a Moomba boat.

Today is the fourth production day of this new Moomba wide-bow wake boat. We have seen the deck created and pulled from the mold. Today we will see the structure of the hull completed in the mold with the sub floor installation and then we will see it pulled out. After the hull has been pulled it will be closely inspected. The deck and the hull together are starting to look like the Mojo.