Pages

Showing posts with label assembly. Show all posts
Showing posts with label assembly. Show all posts

Tuesday, October 4, 2011

Birth of a Moomba Legend: Mojo Build Day 6

Moomba Boats @MoombaBoats is digitally chronicling the first production build of the new Mojo 2.5 wakeboard boat with daily build photo posts. This series of blog posts and photo gallery will illustrate the superior production processes that make a Moomba boat.

Yesterday was the sixth production day of this new Moomba wide-bow wake boat. In the second day of the rigging process, the Mojo 2.5 deck receives interior lean backs and side panels, the aluminum pylon bracket, finished dash wiring, stereo components and wiring, navigation light, cup holders, grab handles and it's Oz Tower. The hull gets everything from carpeting to an Indmar engine to to a fuel tank to a completely fastened deck. The Mojo has a lot going on at this stage of production.

If you missed the previous Mojo 2.5 build posts check'em out: Day 1, Day 2, Day 3, Day 4 and Day 5. If you're ready to order your 2012 Mojo, visit your local Moomba Boats Dealer.

Monday, October 3, 2011

Birth of a Moomba Legend: Mojo Build Day 4

Moomba Boats @MoombaBoats is digitally chronicling the first production build of the new Mojo 2.5 wakeboard boat with daily build photo posts. This series of blog posts and photos galleries will illustrate the superior production processes that make a Moomba boat.

Today is the fourth production day of this new Moomba wide-bow wake boat. We have seen the deck created and pulled from the mold. Today we will see the structure of the hull completed in the mold with the sub floor installation and then we will see it pulled out. After the hull has been pulled it will be closely inspected. The deck and the hull together are starting to look like the Mojo.